Toggle navigation

Hiedls GbR

Location: Altusried (D)

Services: Planning and part turnkey construction

Construction period: Spring 2016

Construction method: Venlo

Total area: 6.000 m²

Web site: http://www.hiedl-gbr.de/

The new Venlo-construction was attached to the existing greenhouse. The 4 mm ESG roofing have reciprocal arranged ridge vents, which guarantee a maximum of air change. We provide also following services: application for planning permission with fire-prevention concept, bankings, foundations, loading ramps and the whole rainwater drainage system. We are particularly proud of the made-to-measure casting car, which allow a improvement of the operating procedures. (© Foto TASPO Projekte /Haymarket)

NEWSLETTER 2019

Gastronomy a "must-have" in the garden centre?

 

now online available for reading!

Sauter grün erleben at Lahr

On 05 April opened the garden centre Sauter at Lahr (DE). We wish every success!